The first hedge that the volunteers have revisited (after 10 years) to lay for a second time
KRIV = Kerridge Ridge and Ingersley Vale, in the east Cheshire townships of Rainow and Bollington
Friday, 4 December 2015
Saturday, 14 November 2015
Friday, 16 October 2015
Wednesday, 30 September 2015
Windyway Head: horse pasture wall repairs
Work by the dry stone walling sub-group of the KRIV Countryside Volunteers
Walling with a kestrel for company
setting the level for the copes (after a few more hours work on 30 Sept)
Friday, 11 September 2015
Footpath improvements: between Cow Lane, Bollington and Ingersley Vale
The existing path is quite steep and very badly drained so unpleasantly muddy in wet weather.
Works involve improvements to drainage, building some steps, refixing a gate and
adjacent fence and, first of all, cutting back some vegetation for access.
Before
After
Repaired fence and new gate
The slab that made for a tight squeeze now a paving slab
Before
Badly drained and uneven stony path
5 hours later
(using timber risers and stobs supplied by Cheshire East Council)
(using timber risers and stobs supplied by Cheshire East Council)
Temporary stone steps
Friday, 4 September 2015
Millbrook, Rainow: footpath and adjacent wall repairs
Continuation of work begun by East Cheshire Ramblers
paths maintenance team led by Brian Richardson
Path Repair 1: stone edge and filling to path eroded by sheep
Wall Repair 1: a section of retaining wall that had collapsed within the last week or so
after heavy rain, with rebuild off new foundation partially complete
Wall Repair 1: from the other side
forward of the original wall line, rebuild partially complete.
Path erosion has undercut the foundations to the original wall
Wall Repair 2: from the side
Path Repair 2: rebuild of path edge and relaying of
slabs covering an old mill leat
other sections of wall have tumbled down but don't block the path
Friday, 28 August 2015
Subscribe to:
Posts (Atom)
























