Continuation of work begun by East Cheshire Ramblers
paths maintenance team led by Brian Richardson
Path Repair 1: stone edge and filling to path eroded by sheep
Wall Repair 1: a section of retaining wall that had collapsed within the last week or so
after heavy rain, with rebuild off new foundation partially complete
Wall Repair 1: from the other side
forward of the original wall line, rebuild partially complete.
Path erosion has undercut the foundations to the original wall
Wall Repair 2: from the side
Path Repair 2: rebuild of path edge and relaying of
slabs covering an old mill leat
other sections of wall have tumbled down but don't block the path