Friday, 27 March 2015

Wall repairs at Windyway near Teggs Nose from March 2015 onwards

Some local repairs are being made to tumble-down dry stone walls
enclosing the Windyway horse pasture.


The not-too-distant peak is Shutlingslow


Windyway horse JD or Dene  photo-bombing the KRIV volunteers


Building a short section of wall off new foundations



A donation kindly made to the KRIV volunteers by the field owners has been donated in turn to the Windyway Trust to put towards the costs of the farrier who tends to the horses.

Over a year on (25 April 2016) the completed repairs are blending in well





Friday, 16 January 2015

Friday, 27 September 2013

Woodland management, drainage works and wall repairs: Tinkers Clough, Bollington

An area of woodland with concessionary path through it, in the care of the Bollington Initiative Trust
pictures by KRIV volunteer Malcolm Bailey